jagomart
digital resources
picture1_Thermal Analysis Pdf 88307 | 05 Critical Path Analysis Presenat


 349x       Filetype PDF       File size 0.29 MB       Source: ans-moodle.ttschoolnet.org


File: Thermal Analysis Pdf 88307 | 05 Critical Path Analysis Presenat
critical path analysis critical path analysis critical path analysis cpa is sometimes called network analysis it is a tool used to plan activities so that a job can be completed ...

icon picture PDF Filetype PDF | Posted on 15 Sep 2022 | 4 years ago
Partial capture of text on file.
 Critical Path Analysis 
  Critical Path Analysis 
          Critical Path Analysis (CPA), is sometimes called 
          Network Analysis 
          It is a tool used to plan activities so that a job can be 
          completed in the shortest time 
          It breaks a job down into a number of tasks, and looks 
          at the dependency of them 
             For example, list the activities that must be completed in order 
             to make a cup of coffee 
          It is used commonly in manufacturing and construction
                                                         © Business Studies Online: Slide 1 
 Parts of the Network 
  Parts of the Network 
       A network consists of 2 things: 
          An ACTIVITY 
             This requires time and/or resources 
             They are drawn as ARROWS from left to right 
             The length of the arrow is NOT important 
          A Node 
             These represent the start and the end of an activity 
             They are represented by CIRCLES 
             Every network MUST start and end with a node
                                                     © Business Studies Online: Slide 2 
 A Simple Network Diagram 
  A Simple Network Diagram 
       A business wishes to build a new factory 
       Before it can do so it needs to: 
          Buy the land (Activity A – will take 12 weeks) 
          Draw up Plans (Activity B – will take 3 weeks) 
       A simple network may be drawn to illustrate this scenario: 
                      A                        B 
                                               3
                     12 
                                                       © Business Studies Online: Slide 3 
 Illustrating Simultaneous Activities 
  Illustrating Simultaneous Activities 
       Of course in reality some activities can be carried out 
       simultaneously 
       Using the previous example: 
          Assume that whilst in the process of buying the land the firm wants 
          to apply for planning permission (Activity AA – will take 14 weeks) 
                       A 
                      12 
                                                B 
                                                3 
                      AA 
                      14
       Try drawing a network using your instructions for making a 
       cup of coffee 
                                                      © Business Studies Online: Slide 4 
The words contained in this file might help you see if this file matches what you are looking for:

...Critical path analysis cpa is sometimes called network it a tool used to plan activities so that job can be completed in the shortest time breaks down into number of tasks and looks at dependency them for example list must order make cup coffee commonly manufacturing construction business studies online slide parts consists things an activity this requires or resources they are drawn as arrows from left right length arrow not important node these represent start end represented by circles every with simple diagram wishes build new factory before do needs buy land will take weeks draw up plans b may illustrate scenario illustrating simultaneous course reality some carried out simultaneously using previous assume whilst process buying firm wants apply planning permission aa try drawing your instructions making...

no reviews yet
Please Login to review.