439x Filetype PDF File size 0.16 MB Source: goldcoastschools.com
AIA ERRATA FOR TABS
AIA A201:
A201
AIA Document 201 (2007) AIA Document 201 (2017)
Ownership and Use of Drawings, Specifications and AIA201 (1.5.1) AIA201 (1.5)
Other Instruments of Service
Information and Services Required of the Owner AIA201 (2.3) AIA201 (2.2.1)
Except for permits and fees that are the responsibility AIA201 (2.3.1) AIA201 (2.2.2)
of the Contractor under the Contract
Documents…(through) the Owner shall secure and
pay for necessary approvals, easements,
assessments and charges required for construction…
Unless otherwise provided in the Contract Documents, AIA201 (2.2.5) AIA201 (2.3.6)
the Owner shall furnish to the Contractor one copy of
the Contract Documents for purposes of making
reproductions.
Owner’s Right to Carry out the Work: If the AIA201 (2.4) AIA201 (2.5)
Contractor defaults or neglects to carry out the Work in
accordance with the Contract …(through) the Owner
may have, correct such default or neglect.
The Work shall be in accordance with approved AIA201 (3.12.8) AIA201 (3.12.7)
submittals except that the Contractor shall not be
relieved …(through) (1)
If the Contractor does not respond promptly or AIA201 (7.3.7) AIA201 (7.3.4)
disagrees with the method for adjustment in the
Contract Sum, the Architect shall determine the
adjustment …(through) Highlight items 1 thru 5 and
pay special notice to sub article 3 “exclusive of hand
tools”.
If the Architect withholds certification for payment AIA201 (9.5.3) AIA201 (9.5.4)
under Section 9.5.1.3, the Owner may…(through)
Contractor failed to make payment for Work properly
performed.
Failure to Purchase Required Property Insurance: AIA201 (11.3.1.2) AIA201 (11.2.2)
If the Owner fails to purchase and maintain the
required property insurance…(through) charged to the
Owner by a Change Order.
The Owner and Contractor waive all rights against (1) - AIA201 (11.3.7) AIA201 (11.3.1)
(3) This waiver of subrogation shall be effective as to a
person or entity – highlight items (1) and (2) in the
same paragraph
A loss insured under the property insurance required AIA201 (11.3.8) AIA201 (11.5.1)
by the Agreement shall be adjusted by the Owner as
fiduciary and made payable to the Owner as fiduciary
for the insureds, as their interests may appear.
Tests, inspections and approvals of portions of the AIA201 (13.5.1) AIA201 (13.4.1)
Work shall be made as required by the Contract
Documents… (through) shall directly arrange and pay
for tests, inspections, or approvals where building
codes or applicable laws or regulations so require.
A201 (cont’d.)
AIA Document 201 (2007) AIA Document 201 (2017)
Interest: Payments due and unpaid under the contract AIA201 (13.6) AIA201 (13.5)
Documents shall bear interest from the date payment
is due at the rate as the parties agree upon in writing
or, in the absence thereof, at the legal rate prevailing
from time to time at the place where the Project is
located.
Claims by either party shall be initiated within 21 days AIA201 (15.1.2) AIA201 (15.1.3.1)
after occurrence of the event giving rise to such Claim
or within 21 days after the claimant first recognizes the
condition giving rise to the claim, whichever is later
If the Contractor wishes to make a Claim for an AIA201 (15.1.5.1) AIA201 (15.1.6.1)
increase in the Contract Time, notice as provided in
Section 15.1.3… (through) continuing delay, only one
Claim is necessary.
Waiver of Claims for Consequential Damages: The AIA201 (15.1.6) AIA201 (15.1.7)
Contractor and Owner waive Claim against each other
for consequential damages… This mutual waiver
includes: highlight items (1) - (2).
AIA A401:
A401
AIA Document 401 (2007) AIA Document 401 (2017)
The Subcontract may be amended or modified only by AIA401 (1.4) AIA401 (1.3)
a Modification to this Subcontract.
The Contractor shall permit the Subcontractor to AIA401 (3.2.3) AIA401 (3.1.2)
request directly from the Architect information
regarding the percentages of completion and the
amount certified on account of Work done by the
Subcontractor.
If hazardous materials or substances are being used AIA401 (3.2.4) AIA (3.3.4)
on the site by the Contractor, a subcontractor,
…(through) sufficient detail and time to permit the
Subcontractor’s compliance with such laws.
The Contractor shall furnish to the Subcontractor AIA401 (3.2.5) AIA401 (3.3.5)
within 30 days after receipt of a written request,
…(through) enforce mechanic’s lien rights.
The Contractor’s Claims for the costs of services or AIA401 (3.3.2) AIA401 (3.4.2)
materials provided due to the Subcontractor’s failure to
execute the Work shall require: highlight items (1) –
(2).
Contractor’s Remedies: If the Subcontractor defaults AIA401 (3.4) AIA401 (3.5)
or neglects to carry out the Work in accordance with
this Agreement and fails… (through) the reasonable
cost from current or future payments due the
Subcontractor.
For all Work the Subcontractor intends to subcontract, AIA401 (4.1.1) AIA401 (4.2.1)
the Subcontractor shall enter into written
agreements… (through) toward each other and having
the benefit of all rights, remedies and redress each
against the other that the Contractor and
Subcontractor have.
The Subcontractor shall supervise and direct the AIA401 (4.1.2) AIA401 (4.2.2)
Subcontractor’s Work, and shall cooperate with the
Contractor in scheduling and performing the
Subcontractor’s Work to avoid conflict, delay un, or
interference with the Work of the Subcontractor.
A401 (cont’d.)
AIA Document 401 (2007) AIA Document 401 (2017)
The Subcontractor shall promptly submit Shop AIA401 (4.1.3) AIA401 (4.2.3.1)
Drawings, Product Data, Samples and similar
submittals required by the Subcontract Documents
with reasonable promptness and such sequence as to
cause no delay in the Work
The Subcontractor shall furnish to the Contractor AIA401 (4.1.4) AIA401 (4.2.4)
periodic progress reports on the Work of this
Subcontract…
The Subcontractor agrees that the Contractor and the AIA401 (4.1.5) AIA401 (4.2.5)
Architect each have the authority to reject Work of the
Subcontractor that does not conform to the Prime
Contract.
The Subcontractor shall take reasonable safety AIA401 (4.3.1) AIA401 (4.4.1)
precautions with respect to performance of this
Subcontract. The Subcontractor shall notify the
Contractor within three days an injury to an employee
or agent of the Subcontractor which occurred at the
site
The Subcontractor shall keep the premises and AIA401 (4.4.1) AIA401 (4.5.1)
surrounding area free from accumulation of waste
materials or rubbish caused by operations performed
under this Subcontract.
The Subcontractor warrants to the Owner, Architect, AIA401 (4.5.1) AIA401 (4.6.1)
will be free from defects, except for those inherent in
the quality of the Work the Subcontracts Documents
require or permit.
Remedies for Nonpayment: If the Contractor does not AIA401 (4.7) AIA401 (4.8)
pay the Subcontractor through no fault of the
Subcontractor, within seven days … (through) Work of
this Subcontract until payment of the amount owing
has been received.
The period covered by each application for payment AIA401 (11.2) AIA401 (11.1.2)
shall be one calendar month ending on the last day of
the month.
Substantial Completion: Within 30 days following AIA401 (11.9) AIA401 (11.2)
issuance by the Architect of the certificate for payment
covering… (through) certificate to cover costs of items
to be completed or corrected by the Subcontractor.
Final payment, constituting the entire unpaid balance AIA401 (12.1) AIA401 (11.3.1)
of the Subcontract Sum, shall be made by the
Contractor… (through) the Owner, final payment to the
Subcontractor shall be made upon demand.
If the required property insurance is not in effect… AIA401 (13.8.2) AIA401 (12.4.2)
(through) insurance by an adjustment in the
Subcontract Sum.
no reviews yet
Please Login to review.