STANDAR HARGA SATUAN
A. HARGA SATUAN UPAH
DAFTAR HARGA SATUAN UPAH
URAIAN UPAH (SWAKELOLA) UPAH (KONTRAKTUAL)
Org/jam Org/hr Org/jam Org/hr
Mandor Rp 13,637.40 Rp 109,099.20 Rp 15,001.14 Rp 120,009.12
Kepala Tukang Batu Rp 12,835.20 Rp 102,681.60 Rp 14,118.72 Rp 112,949.76
Kepala Tukang Kayu Rp 12,835.20 Rp 102,681.60 Rp 14,118.72 Rp 112,949.76
Kepala Tukang Besi Rp 12,835.20 Rp 102,681.60 Rp 14,118.72 Rp 112,949.76
Kepala Tukang Cat Rp 12,835.20 Rp 102,681.60 Rp 14,118.72 Rp 112,949.76
Kepala Tukang Listrik Rp 12,835.20 Rp 102,681.60 Rp 14,118.72 Rp 112,949.76
Tukang Batu Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 98,831.04
Tukang Kayu Rp 12,033.00 Rp 96,264.00 Rp 13,236.30 Rp 105,890.40
Tukang Besi/Baja Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 98,831.04
Tukang Aluminium Rp 12,033.00 Rp 96,264.00 Rp 13,236.30 Rp 105,890.40
Tukang Cat Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 98,831.04
Tukang Listrik Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 98,831.04
Tukang Pipa Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 98,831.04
Tukang Plitur Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 98,831.04
Tukang Taman Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 98,831.04
Upah - Hal 1
Pembantu Tukang Rp 8,022.00 Rp 64,176.00 Rp 8,824.20 Rp 70,593.60
Pekerja Biasa Rp 8,022.00 Rp 64,176.00 Rp 8,824.20 Rp 70,593.60
Penjaga Malam Rp 8,022.00 Rp 64,176.00 Rp 8,824.20 Rp 70,593.60
Sopir Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 98,831.04
Operator Rp 12,835.20 Rp 102,681.60 Rp 14,118.72 Rp 112,949.76
Mekanik Rp 11,230.80 Rp 89,846.40 Rp 12,353.88 Rp 98,831.04
Pembantu Sopir Rp 9,626.40 Rp 77,011.20 Rp 10,589.04 Rp 84,712.32
Pembantu Operator Rp 9,626.40 Rp 77,011.20 Rp 10,589.04 Rp 84,712.32
Pembantu Mekanik Rp 9,626.40 Rp 77,011.20 Rp 10,589.04 Rp 84,712.32
Upah - Hal 2
B. HARGA SATUAN DASAR PERALATAN 1.00
STANDAR RATA-RATA SEWA ALAT BERAT, KENDARAAN, TRUK, DAN LAIN-LAIN
NO URAIAN KODE HP KAP HARGA ALAT BIAYA SEWA
ALAT/JAM
1 Asphalt Mixing Plant E01 294 60.0 T/jam 7,134,232,000.00 5,533,588.00
2 Asphalt Finisher E02 72.4 10.0 Ton 2,662,537,500.00 403,287.00
3 Asphal Sprayer E03 4 850 Liter 107,013,480.00 58,900.00
4 Bulldozer 100-150 HP E04 155 - Hp 1,107,036,000.00 439,257.00
5 Compressor 4000-6500 L/M E05 60 5,000 Liter 227,557,400.00 170,300.00
6 Concrete Mixer 0.3-0.6 M3 E06 20 500 Liter 215,872,000.00 160,000.00
7 Crane 10-15 Ton E07 138 15 Ton 1,830,229,500.00 216,410.00
8 Dump Truck 3.5 Ton E08 100 3.5 Ton 338,261,000.00 187,200.00
9 Dump Truck 10Ton E09 190 10 Ton 676,522,000.00 323,100.00
10 Excavator 80-140 HP E10 133 0.9 M3 1,045,534,000.00 399,995.00
11 Flat Bed Truck 3-4 M3 E11 190 10 Ton 1,537,550,000.00 275,120.00
12 Generator Set E12 180 135 KVA 738,024,000.00 411,400.00
13 Motor Grader > 100 HP E13 135 10,800 HP 2,275,574,000.00 318,600.00
14 Track Loader 75-100 HP E14 70 0.8 M3 666,681,080.00 259,272.00
15 Wheel Loader 1.0-1.6 M3 E15 96 1.5 M3 693,742,500.00 312,327.00
16 Three Wheel Roller 6-8 T E16 55 8 Ton 430,514,000.00 198,352.00
17 Tandem Roller 6-8 T E17 82 8.1 Ton 1,470,420,500.00 363,970.00
18 Tire Roller 8-10 T E18 100.5 9 Ton 1,107,036,000.00 375,140.00
19 Vibratory Roller 5-8 T E19 82 7.1 Ton 1,130,145,000.00 301,470.00
20 Concrete Vibrator E20 5.5 25 HP 49,201,000.00 48,515.00
ALat - Hal 3
21 Stone Crusher E21 220 50 T/jam 1,243,557,000.00 635,860.00
22 Water Pump 70-100 mm E22 6 - - 430,514,000.00 47,445.00
23 Water Tanker 3000 - 4500 L E23 100 4,000 Liter 922,530,000.00 240,630.00
24 Pedestrian Roller E24 8.8 835 Ton 184,506,000.00 88,660.00
25 Tamper E25 4.7 121 Ton 52,276,000.00 51,900.00
26 Jack Hammer E26 0 1,330 HP 43,501,000.00 80,845.00
27 Fulvi Mixer E27 345 2,005 HP 2,029,566,000.00 1,151,150.00
28 Concrete Pump E28 100 8 M3 240,000,000.00 232,440.00
29 Trailer 20 Ton E29 175 20 Ton 738,024,000.00 456,810.00
30 Pile Driver + Hammer (2,5 Ton) E30 25 2.50 Ton 40,762,850.00 230,180.00
31 Pile Driver + Hammer (15 Ton) E30a 150 15.00 Ton 70,000,000.00 312,900.00
32 Crane On Track 35 Ton E31 125 35 Ton 828,000,000.00 399,405.00
33 Welding Set E32 40 250 Amp 215,257,000.00 113,670.00
34 Bore Pile Machine E33 150 2,000 Meter 2,365,500,000.00 699,815.00
35 Asphal Liqued Mixer E34 5 1,000 Liter 43,051,000.00 47,280.00
36 Tronton E35 150 15 Ton 799,526,000.00 459,790.00
37 Cold Milling E36 248 1,000 m 2,583,084,000.00 1,298,400.00
38 Rock Drill Breaker E37 3 - - 608,254,000.00 202,450.00
39 Cold Recycler E38 900 2.2 m 9,778,818,000.00 4,812,755.00
40 Hot Recycler E39 400 3 m 11,377,870,000.00 5,652,890.00
41 Aggregat (Chip) Spreader E40 115 3.5 m 608,869,000.00 404,200.00
42 Asphal Distributor E41 115 4,000 Liter 485,865,000.00 314,250.00
43 Slip Form Paver E42 105 2,5 m 1,644,739,000.00 431,725.00
44 Concrete Pan Mixer E43 134 600 Liter 1,230,040,000.00 429,290.00
ALat - Hal 4