Authentication
321x Tipe XLSX Ukuran file 0.03 MB Source: expertindo-training.com
KATEGORI 8: MANAJEMEN PROYEK & MANAJEMEN PERAWATAN
NO KODE JUDUL TRAINING
1 PM-001 AHLI DESAIN TEROWONGAN (TUNNEL DESIGN ENGINEER)
2 PM-002 AHLI JAMINAN MUTU PEMANFAATAN BANGUNAN
PM-003 AHLI K 3 KONSTRUKSI
3
4 PM-004 AHLI PENGAWASAN PEKERJAAN JEMBATAN
5 PM-005 AHLI PERENCANAAN UMUM JALAN
6 PM-006 AHLI PERKIRAAN BIAYA JEMBATAN
7 PM-007 AHLI STRUKTUR KONSTRUKSI JEMBATAN
8 PM-008 AHLI TEKNIK DESAIN JALAN (ROAN DESIGN ENGINEER)
9 PM-009 ANALISIS DAN DESAIN STRUKTUR MENGGUNAKAN ETABS
10 PM-010 ANALISIS HARGA SATUAN
11 PM-011 APPLIED RISK ASSESSMENT INTO EPC PROJECT
12 PM-012 AUDIT HASIL PEKERJAAN KONSTRUKSI
PM-013 BEST PRACTISE IN QUALITY ASSURANCE UNTUK PENYUSUNAN RENCANA MUTU
13 KONTRAK KONSTRUKSI
14 PM-014 BUILDING MANAGEMENT
15 PM-015 BUILDING SUPERVISION AND QUALITY CONTROL OF CIVIL WORK
PM-016
16 CLOSING AND HANDOVER PROJECT (PENUTUPAN DAN SERAH TERIMA PROYEK)
17 PM-017 CONSTRUCTION METHODS AND CONSTRUCTION MANAGEMENT
18 PM-018 DASAR-DASAR MANAJEMEN PROYEK
19 PM-019 DASAR-DASAR MANAJEMEN PROYEK
20 PM-020 FEED (Front End Engineering Design) Projec Control.
21 PM-021 FINANCING ENERGY PROJECT & PROJECT STRUCTURING
22 PM-022 FLIGHT OPERATION OFFICER
23 PM-023 GREEN BUILDING CONCEPT
24 PM-024 LANDSCAPE DAN PERTAMANAN
25 PM-025 MANAGING PROJECT EPC CONTRACT FOR SUCCESSFUL OIL AND GAS PROJECT
PM-026 MANAJEMEN FASILITAS DAN KESELAMATAN BANGUNAN GEDUNG DAN FASILITAS
26 RUMAH SAKIT
27 PM-027 MANAJEMEN INFRASTRUKTUR
PM-028 MANAJEMEN PERAWATAN BANGUNAN GEDUNG DAN FASILITAS
28
PM-029 Manajemen Perawatan Gedung & Fasilitas Dan Audit/manajemen energi Listrik Serta
29 Safety Pencegahan Terhadap Bahaya Kebakaran Di Gedung
30 PM-030 MANAJEMEN PROYEK STRATEGI SUKSES DAN IMPLEMENTASI
PM-031 MANAJEMEN PROYEK IT
31
32 PM-032 MANAJEMEN PROYEK KONSTRUKSI
PM-033 MANAJEMEN PROYEK KONSTRUKSI DAN PEMELIHARAAN GEDUNG (BUILDING
33 MAINTENANCE)
34 PM-034 Master Project Manager
35 PM-035 MATERIAL MANAGEMENT FOR PROJECT
36 PM-036 MERANCANG BANGUNAN GEDUNG DENGAN SKETCH UP
PM-037 PELATIHAN PEMBINAAN INSINYUR DAN SERTIFIKASI INSINYUR PROFESIONAL
37
38 PM-038 PENDIRIAN POLIKLINIK DAN RUMAH SAKIT KONSEP & APLIKASI
39 PM-039 PENGAWASAN BANGUNAN GEDUNG (BUILDING SUPERVISION)
40 PM-040 PENGENDALIAN MUTU DAN ASPEK HUKUM PADA PROYEK KONTRUKSI
PM-041 PENYUSUNAN ANGGARAN PERAWATAN BANGUNAN GEDUNG DAN FASILITAS
41
42 PM-042 PENYUSUNAN KAJIAN TEKNIS BANGUNAN UNTUK SERTIFIKAT LAIK FUNGSI (SLF)
43 PM-043 PENYUSUNAN RENCANA ANGGARAN BIAYA UNTUK PROGRAM KEMITRAAN BINA LINGKU
44 PM-044 PLAXIS 2D BASIC TO INTERMEDIATE
45 PM-045 PROJECT CONTROL MANAGEMENT
46 PM-046 PROJECT COST MANAGEMENT
47 PM-047 PROJECT EXECUTION & MANPOWER MOBILITATION
48 PM-048 PROJECT FEASIBILITY STUDY
49 PM-049 Project Financing
50 PM-050 Project Financing For Oil and Gas
51 PM-051 PROJECT MANAGEMENT (MANAJEMEN PROYEK)
52 PM-052 PROJECT MANAGEMENT (PM)
53 PM-053 PROJECT MANAGEMENT DENGAN MICROSOFT PROJECT
54 PM-054 PROJECT MANAGEMENT DENGAN PRIMAVERA
55 PM-055 PROJECT MANAGEMENT FOR ENGINEERING AND CONSTRUCTION
56 PM-056 PROJECT MANAGEMENT FOR NON PROJECT MANAGER
57 PM-057 PROJECT MANAGEMENT IN ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC)
58 PM-058 PROJECT MANAGEMENT OFFICE (PMO)
59 PM-059 Project Manager
60 PM-060 PROJECT MONITORING AND EVALUATION
61 PM-061 PROJECT RISK MANAGEMENT WITH MONTECARLO ANALYSIS
62 PM-062 PROJECT SCHEDULING
63 PM-063 PROJECT TIME MANAGEMENT (PTM)
PM-064 QUALITY ASSURANCE FOR ENGINEER
64
PM-065 QUALITY CONTROL OF CIVIL WORK (PENGENDALIAN MUTU PADA PROYEK
65 KONSTRUKSI)
66 PM-066 QUANTITY SURVEYOR
67 PM-067 RENCANA KERJA DAN ANGGARAN PERUSAHAAN
68 PM-068 SAP 2000 & TEKLA For Analysist Structure
69 PM-069 SAP 2000 DAN TEKLA
70 PM-070 SILABUS PELATIHAN KELAYAKAN INVESTASI
71 PM-071 STUDI KELAYAKAN PROPERTI
72 PM-072 System Dynamics Dengan STELLA
73 PM-073 TEAM BUILDING
74 PM-074 TEKNIK PENYUSUNAN ANGGARAN PROYEK
75 PM-075 TEKNIK PENYUSUNAN HPS
76 PM-076 VALUE ENGINEERING
77 PM-077 SISTEM PENYEDIAAN AIR MINUM
78 PM-078 STRUKTUR KAYU DAN BAMBU
79 PM-079 Penilaian Properti Komersial - Hotel, Retail,dll
80 PM-080 IR. Rini Darmastiti,MSC,Phd
81 PM-081 TEKNIK PENYUSUNAN SOP SATUAN PENGAMANAN
82 PM-082 Maintenance Untuk High Rise
83 PM-083 MENCEGAH KECELAKAAN KERJA PADA PROYEK KONSTRUKSI
84 PM-084 Pelatihan Analisa Harga Satuan SNI untuk Rencana Anggaran Biaya
85 PM-085 PENGAWASAN PEKERJAAN KONSTRUKSI DI LAPANGAN DAN FORENSIC ENGINEERING
86 PM-086 PILE FOUNDATION
87 PM-087 PLAXIS 2D
88 PM-088 SOIL MECHANICS, THEORY & APPLICATION
89 PM-089 TEKNIK PEMETAAN DAN SURVEY LAPANGAN PADA BIDANG KONSTRUKSI
90 PM-090 Training Basic Bangunan dan Pekerjaan Bangunan
91 PM-091 Training Basic Land Preparation
92 PM-092 Training Basic Perancangan Perkerasan Jalan
93 PM-093 Training Asuransi Pembangunan Kapal – Hull & Machinery and Protection & Indemnity
94 PM-094 ANALISIA UJI STRUKTUR BANGUNAN GEDUNG
95 PM-095 CONSTRUCTION MANAGEMENT OIL & GAS
96 PM-096 Contractor & Stakeholder Management
97 PM-097 Structural Design of Industrial Facilities
98 PM-098 Insurance & Claim ( Marine, Freight Forwading & Port Infrastructur)
KATEGORI 8: MANAJEMEN PROYEK & MANAJEMEN PERAWATAN
Tahun 2020
LEAD INSTRUKTUR Januari Februari Maret
Toriq Arif Ghuzdewan,ST,MCSE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif Ghuzdewan,ST,MCSE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif Ghuzdewan,ST,MCSE dan Drs. 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Suharyana, M.Kes
Toriq Arif Ghuzdewan,ST,MCSE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif Ghuzdewan,ST,MCSE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif Ghuzdewan,ST,MCSE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif Ghuzdewan,ST,MCSE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif Ghuzdewan,ST,MCSE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Wahyu Bintoro, ST, CIPM and Team 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif Ghuzdewan,ST,MCSE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arief Ghzdewan,ST,MSCE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif Ghuzdewan, ST, MSCE and team 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif Ghuzdewan,ST,MCSE
Toriq Arif Ghuzdewan,ST,MCSE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif Ghuzdewan,ST,MCSE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif Ghuzdewan,ST,MCSE
Toriq Arif Ghuzdewan,ST,MCSE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Dr. Ir. Fauzi Hasan. MM, MBA 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Dr. Ir. Fauzi Hasan. MM, MBA 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arief Ghzdewan,ST,MSCE , Ir. Surono., 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arief Ghzdewan,ST,MSCE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Team Instruktur Penerbangan 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Dr. Ir. H. Muslikh, M.Sc., M.Phil 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Arief Heru Swasono IAI, IPM 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arief Ghzdewan,ST,MSCE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif ghuzdewan,ST,MCSE dan Tugini ST MT
Toriq Arif Ghuzdewan,ST,MCSE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif ghuzdewan,ST,MCSE dan Tugini ST MT
6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Tugino, ST MT & Team
Toriq Arief Ghzdewan,ST,MSCE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif Ghuzdewan,ST,MCSE dan Yuli Agusti 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Rochman, ST.,M.Eng
Toriq Arif Ghuzdewan,ST,MCSE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Dr. Ir. Fauzi Hasan. MM, MBA
American Academy Certified Consultant 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Drs Miswanto,M.Si 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Toriq Arif Ghuzdewan, ST., MSCE 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Tim Instruktur Persatuan Insinyur Indonesia
Drs H Moeljadi 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
Dr. Ir. H. Muslikh, M.Sc., M.Phil 6-8 13-15 20-22 27-29 3-5 10-12 17-19 26-28 2-4 9-11
no reviews yet
Please Login to review.